July 10, 2025

V-Suites in Business Bay Construction Update July 2025

V-Suites in Business Bay Construction Update July 2025

V-Suites, which used to be called Vento Tower, is becoming a big talk in Dubai’s Business Bay area. This project is not just about building a tall tower and adding to the city skyline. V-Suites is a premier 19-Story residential building by ANAX Developments, envisioned to deliver modern luxury, smart living, and architectural excellence. 

Designed for urban professionals and discerning homeowners, V-Suites offers a sophisticated lifestyle enriched with top-tier amenities, sustainable design, and seamless connectivity.

Feature

Details

LocationBusiness Bay, Dubai
Property TypesExecutive Suite | Signature Suite | Sterling Suite | The Villa
Unit Sizes477–2,831sqft
Starting Price
  • Executive Suite from AED 1.62M / 477 sq ft
  • Signature Suite from AED 2.43M / 700 sq ft
  • Sterling Suite from AED 5.26M / 1987 sq ft
     
Payment Plan
  • 10% down, 20% during construction, 20% on handover.
  • 50% post-handover within 5 years (30/70 structure)
     
FurnishingFully furnished, interiors by Venetian Enrico
Smart FeaturesSmart home systems integrated in all units

2024 marked a transformative phase for V-Suites, with several foundational achievements that paved the way for rapid development. Key phases such as shoring, piling, and groundbreaking were executed to precision, setting the stage for vertical progress in 2025.

As of mid-2025, V-Suites has continued on a steady path of execution. Below are the most recent updates:

100% Retaining Walls Completed

The retaining walls are now fully finished. These walls are very important because they hold back the soil and keep the ground stable around the building base. Think of them as strong, protective barriers that stop the earth from moving or sliding. Without these walls done properly, the tower could face serious problems. Completing the retaining walls means the foundation is safe and secure, giving a solid base for all the work that comes next. It is a big step showing the construction is on strong footing.

Read More: 5 Best Off-Plan Properties in Business Bay in 2025

95% Core Structural Elements Completed

Almost all the core parts of the building’s structure are done, around 95%. This includes the big columns, the central core, and the shear walls. Together, these form the skeleton of the tower. They give the building strength and balance, so it can stand tall and safe against winds, earthquakes, and heavy loads. This high progress means the main frame of the tower is almost ready. Once this is fully finished, the rest of the building can quickly take shape around it.

Ramp and Ground Floor Slab Formwork is in Progress

Currently, the construction team is working on the ramp and ground floor slab, which means they are making the base slab and the car ramp structure. This part is very important because it forms the entrance and parking area of the building. It needs to be very strong and flat to support cars and people. The forming process involves shaping the concrete before it is poured and sets hard. When this step is done, the lower floors and the rest of the building can rise quickly on a solid base.

Conclusion

V-Suites is more than just another building in Dubai. The construction progress shows the project is moving steadily and well. It blends luxury, convenience and technology to create a new way of living in one of the city’s best neighborhoods.

This exciting project is brought to life by Anax Developments, a team dedicated to creating homes that match Dubai’s fast pace and bright future. Soon, V-Suites will shine proudly on the city skyline, welcoming those ready to live in style and comfort.